Hydrogen embrittlement
Hydrogen embrittlement occurs as a result of exposure to hydrogen, for example, in the manufacture or processing of high-strength steels and titanium and aluminium alloys. It reduces the ductility and load-bearing capacity of affected materials, which can cause cracking or failure at below normal yield stresses.
Hydrogen embrittlement takes place when recently-produced, nascent hydrogen atoms diffuse into the metal. When load is applied, the hydrogen atoms migrate towards areas of high stress, and the resulting pressure causes sub-microscopic cracking. These cracks themselves become areas of high stress, and so the process continues and the cracks spread through the material, which can ultimately result in failure.
In November 2014, two large bolts fractured at the 47-storey, 737ft Leadenhall Building, popularly known as ‘The Cheesegrater’ because of its distinctive slanting profile, created to respect a protected sight line of St Paul’s Cathedral. A small part of one of the bolts fell from the fifth floor to the ground, but the area was not publicly accessible due to ongoing construction works and nobody was injured.
A third bolt then fractured but was captured by tethering which had been installed following the first two failures.
Investigations undertaken by contractor Laing O’Rourke and structural engineers Arup confirmed that the problem was limited to certain bolts. Tests concluded that the bolts had failed due to hydrogen embrittlement. Arup also confirmed that there was no adverse effect on the structural integrity of the building. However, a programme was undertaken to replace a number of bolts a precautionary measure.
In April 2019, Structural steelwork contractor Severfield released a trading update announcing that it had reached a final settlement with developer Leadenhall following “extensive negotiations”. Ref http://www.constructionmanagermagazine.com/news/severfield-settles-over-cheesegrater-bolts/
[edit] Related articles on Designing Buildings Wiki
- Brittle fracture.
- Corrosion.
- Degradation of construction materials.
- Failure of cast iron beams.
- Failure of metals.
- Graphitisation.
- Leadenhall building.
- Rust.
- Spalling.
[edit] External references
- Global Construction Review. Fear of failure: Why bolts on London’s Cheesegrater tower began to break. 16 January 2015.
Featured articles and news
Editor's broadbrush view on forms of electrical heating in context.
The pace of heating change; BSRIA market intelligence
Electric Dreams, Boiler Realities.
New President of ECA announced
Ruth Devine MBE becomes the 112th President of the Electrical Contractors Association.
New CIAT Professional Standards Competency Framework
Supercedes the 2019 Professional Standards Framework from 1 May 2025.
Difficult Sites: Architecture Against the Odds
Free exhibition at the RIBA Architecture Gallery until 31 May.
PPN 021: Payment Spot Checks in Public Sub-Contracts
Published following consultation and influence from ECA.
Designing Buildings reaches 20,000 articles
We take a look back at some of the stranger contributions.
Lessons learned from other industries.
The Buildings of the Malting Industry. Book review.
Conserving places with climate resilience in mind.
Combating burnout.
The 5 elements of seiri, seiton, seiso, seiketsu and shitsuke.
Shading for housing, a design guide
A look back at embedding a new culture of shading.
The Architectural Technology Awards
The AT Awards 2025 are open for entries!
ECA Blueprint for Electrification
The 'mosaic of interconnected challenges' and how to deliver the UK’s Transition to Clean Power.
Grenfell Tower Principal Contractor Award notice
Tower repair and maintenance contractor announced as demolition contractor.